Complete technical parameters

Registration Date

2024-11-28

Odometer Reading

52,000 km

Transmission

Automatic

Vehicle Color

White

Emission Standard

China VI

Vehicle Type

Van

Energy Type

Diesel

Vehicle Class

Light Truck

Max Power

110 kW

Length*Width*Height

5498*2062*2535

Official 0-100 km/h

-

Max Torque

375 N.m

Body Structure

Bus

Displacement

2.0T

Gearbox Specs

6-speed manual

Engine / Powertrain

2.0T 150HP L4

Vehicle detailed photos

Official high-resolution detail photos covering exterior, cabin, and core components. Click any image to view larger.

Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 1
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 2
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 3
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 4
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 5
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 6
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 7
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 8
Maxus 2024 New V90 2.0T Zhijie Front-Wheel Drive Long Wheelbase High Roof Single Rear Tire 6/7-SeaterOfficial HD photo 9

International purchase and port dispatch process

01

Confirm model and stock

Match the target model, spec, budget, and destination port.

02

Inspection and verification

Share photos, video, inspection notes, and key parameters.

03

Contract and documents

Prepare invoice, export license, customs files, and payment milestones.

04

Port preparation

Handle cleaning, recheck, port handover, RoRo or container booking.

05

Shipment follow-up

Track vessel schedule, bill of lading, arrival, and clearance support.