Complete technical parameters

Registration Date

2021-08-17

Odometer Reading

90,000 km

Transmission

Manual

Vehicle Color

White

Emission Standard

China VI

Vehicle Type

Van

Energy Type

Diesel

Vehicle Class

Light Truck

Max Power

102 kW

Length*Width*Height

5785×1998×2552

Official 0-100 km/h

-

Max Torque

330 N.m

Body Structure

Bus

Displacement

2.0T

Gearbox Specs

6-speed manual

Engine / Powertrain

2.0T 139HP L4

Vehicle detailed photos

Official high-resolution detail photos covering exterior, cabin, and core components. Click any image to view larger.

Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 1
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 2
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 3
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 4
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 5
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 6
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 7
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 8
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 9
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 10
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 11
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 12
Maxus 2019 V80 Plus 2.0T Ao Yuntong Long Wheelbase High Roof 7-SeaterOfficial HD photo 13

International purchase and port dispatch process

01

Confirm model and stock

Match the target model, spec, budget, and destination port.

02

Inspection and verification

Share photos, video, inspection notes, and key parameters.

03

Contract and documents

Prepare invoice, export license, customs files, and payment milestones.

04

Port preparation

Handle cleaning, recheck, port handover, RoRo or container booking.

05

Shipment follow-up

Track vessel schedule, bill of lading, arrival, and clearance support.